End of 2026-05-19 cutover-debug session. Saves the full state +
2 outstanding bugs + Faza G/H plan into docs/plans/ so the next
session can resume without re-investigating.
- prompt-handoff-2026-05-19.md: short prompt for the next session
to amend + resume.
- audit-2026-05-19.md: auditor-agent output (~30 findings).
- 004-faza-h-runbook.md: pg_dump + REVOKE + DROP runbook with
prereqs (eterra.live shares DB, unidentified writer, CfExtract
schema drift).
Memory entries also written:
- feedback/authentik-token-endpoint-shared
- project/architools-cutover-state-2026-05-19
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
- TILE-SERVER-EVALUATION.md: updated to reflect current architecture (PMTiles z0-z18)
- MODULE-MAP.md: added PMTiles + tile-cache to Geoportal section
- Monitor: timeout increased to 90 min for z18 builds, description updated
- Added PROMPT-GEOPORTAL-IMPROVE.md with mega prompt for future sessions
(includes MLT check, mvt-rs evaluation prompt, operational commands)
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
Complete Next.js 16 application with 13 fully implemented modules:
Email Signature, Word XML Generator, Registratura, Dashboard,
Tag Manager, IT Inventory, Address Book, Password Vault,
Mini Utilities, Prompt Generator, Digital Signatures,
Word Templates, and AI Chat.
Includes core platform systems (module registry, feature flags,
storage abstraction, i18n, theming, auth stub, tagging),
16 technical documentation files, Docker deployment config,
and legacy HTML tool reference.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>